High-Load, Flood-Resilient Keystone & TW3 Wall at Proximity Botany Bay
Earth Retaining Structures
Discipline
Goodman Group
CUSTOMER
Banksmeadow, NSW
Location

Challenge
Deliver over 300 m of earth-retaining walls within a floodplain-constrained industrial redevelopment, balancing strict DA flood elevation requirements with tight boundary offsets, underground culverts, and heavy pavement loadings — all while aligning with a fast-paced construction program.
Solution
Konceptual designed modular Keystone block walls with geogrid reinforcement and No-Fines-Concrete across four facades of the logistics estate. The walls accommodated complex earthworks, hydrostatic uplift, Higher than usual loads, and 100-year flood constraints. Staged construction enabled early drainage and slab works without delaying the flood infrastructure.
Key Highlights
1100m2 of segmental retaining wall blocks, up to 3.2 m high.
80% grid coverage via positive-connection blocks, despite enormous loading requirements reducing cost by 15%
less than 20 mm settlement over soft marine clays by incorporating ground improvement techniques
Utilizing both Positive and Frictional connection types as well as NFC walls
Visual Gallery
Related Projects
REACH OUT TO KONCEPTUAL
Let’s Build Something Lasting.
The right engineering input at concept stage saves months on site. Let's talk about your next project.